摘要
万家沟水库混凝土双曲拱坝为内蒙古自治区第一座该类型坝。为了解决除险加固中遇到的工程地质问题并提取相关岩体参数,在野外地质勘察基础上,进行了工程地质分区。通过对比各区域的工程地质条件以及各区域代表性岩石的室内试验结果,提出适宜的工程场地亚区。进而有针对性的开展了岩体原位试验,得出岩体的强度参数。为后期的除险加固提供依据。
Wan Jia Gou concrete double curvature arch dam is the first type of dam in the Inner Mongolia. In order to solve the en- gineering geological problems and provide relevant parameters for removing danger and reinforcement, engineering geological zoning was carried out on the basis of field geological survey. By comparing the engineering geological conditions of each area and the results of laboratory tests of representative rocks, put forward the suitable engineering site. Furthermore targeted carried out in situ rock test, draw strength parameters of rock. Provide a basis for removing danger and reinforcement.
出处
《内蒙古农业大学学报(自然科学版)》
CAS
2016年第5期98-101,共4页
Journal of Inner Mongolia Agricultural University(Natural Science Edition)
基金
内蒙古自治区自然科学基金项目(2016MS0552)
关键词
工程地质分区
岩体强度
原位试验
水利勘测
Engineering geological zoning
rock strength
in -situ test
water survey