期刊文献+

基于人机协同机制的动态作业调度系统研究 被引量:1

Dynamic job scheduling system research based on man-machine coordinated mechanism
在线阅读 下载PDF
导出
摘要 针对离散制造业的单件、小批量生产的特点,根据企业的实际生产特点和需求,在分析车间动态调度系统调度流程的基础上,设计了系统模块功能,构建了以生产批次为单位、拖期个数及生产周期最小为目标的优化模型,采用先到先服务、优先级等规则对该调度模型的最优近似解进行求解。在调度过程中,采用基于事件的调度策略,同时充分考虑到人在系统中的主观能动性,开发了基于人机协同机制的动态作业车间调度系统。 Aimed at the characteristics of discrete manufacturing of single piece and small batch production, ac cording to the characteristics and needs of actual production enterprises, the analysis of the workshop scheduling process design based on the dynamic scheduling system should have the function of the module. Build the batch for production units, the target of minimizing tardiness number and the production cycle optimization model, uses the first come first service, priority rules for the scheduling model to solve the optimal approximate solution. In the process of scheduling, the scheduling strategy based on events, while fully considering the subjective initiative of people in the system, develop a dynamic job shop scheduling system based on man -machine coordinated mechanism.
出处 《制造技术与机床》 北大核心 2016年第12期118-122,共5页 Manufacturing Technology & Machine Tool
基金 国防基础科研重大项目(No.A1120131044) 国防技术基础项目(JSZL2014210B001)
关键词 人机协同机制 动态调度 调度管理系统 甘特图 man - machine cooperation mechanism dynamic scheduling scheduling management system Gantt chart
  • 相关文献

参考文献2

二级参考文献14

  • 1习小英,邹海峰,王英明,姜莉莉.单件小批量生产作业计划的倒排产算法研究[J].现代制造工程,2004(9):5-6. 被引量:7
  • 2潘全科,朱剑英.作业车间动态调度研究[J].南京航空航天大学学报,2005,37(2):262-268. 被引量:29
  • 3王健,杨建军,杨达玲.基于约束满足的Job-shop车间生产再调度系统[J].现代制造工程,2006(5):16-18. 被引量:4
  • 4Vi jayan, Jaikumar. Manufacturing Execution Systems[ J ]. Computer World ,2000,34( 31 ) :38 - 42.
  • 5许文砚.基于单件小批生产模式的车间调度方法研究和系统开发[D].南京:南京航空航天大学,2004.
  • 6姬永清.多品种单件小批生产模式下生产计划与调度问题研究[D].南京:南京航空航天大学,2004.
  • 7Bruker P,Schlie R.Job shop scheduling with muhi purpose machines [ J ]. Computing, 1990,45 ( 4 ) : 369-375.
  • 8Liu Yong-xian,Liu Xiao-tian.Research on job-shop scheduling optimization method with limited resources [J].International Journal of Advanced Manufacturing Technology, 2008,38(3 ) : 386-392.
  • 9Mirsanei, H.S.A simulated annealing algorithm approach to hybrid flow shop scheduling with sequence-dependent setup times [J].Journal of Intelligent Manufacturing, 2011,22(6) : 965-978.
  • 10Moslehi, Ghasem.A Pareto approach to multi-objective flexible job-shop scheduling problem using particle swarm optimization and local search [ J ].International Journal of Production Economics, 2011,129( 1 ) :14-22.

共引文献12

同被引文献8

引证文献1

二级引证文献4

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部