燃气冷热电三联供在某项目中应用的方案选择

The Choice of Gas combined cooling heating and power(CCHP) in a Project
在线阅读 下载PDF
导出
摘要 简单介绍了三联供的概念、二氧化碳的影响,着重阐述了三联供在某工业园区的应用及方案选择,燃气机组总发电量为3×2 575 k W,峰值时所需的用电量由市政电网供给。针对某项目减少二氧化碳排放的要求,进行了详细的计算比较。 The concept of CCHP and the influence of carbon dioxide were briefly introduced. The application and scheme of CCHP in an industrial park were emphatically expounded. The total generating capacity of gas generator was 3×2 575 k W, the peak power consumption was supplied by the municipal grid. In order to reduce the carbon dioxide emission of a project, a detailed comparisons were made.
作者 肖秀枝
出处 《上海化工》 CAS 2016年第11期29-33,共5页 Shanghai Chemical Industry
关键词 三联供 CO_2 方案选择 Combined cooling heating and power(CCHP) Carbon dioxide(CO_2) Scheme selection