期刊文献+

选煤厂工艺管道设计的探讨

An investigation into design of process pipeline of coal preparation plant
在线阅读 下载PDF
导出
摘要 合理设计和布置生产管道是选煤厂运转顺畅、降低生产成本的关键环节。文章结合典型动力煤选煤厂工艺管道设计经验,介绍了选煤厂工艺管道管径、管材、阀门和管件的选取依据,阐述了管道布置的原则及过程,提出了三维设计是未来管道设计的发展方向,总结了动力煤选煤厂工艺管道设计安装过程的注意事项,为其他选煤厂管道设计提供了有益借鉴。 Rational design and layout of process pipeline is a key link for enabling a coal preparation plant to realize coat processing with reduced cost. On the basis of the experience gained in the design of the process pipeline for a typical power coal washery, the paper elaborates on the criteria for the selection of pipe size, material, fittings and valves, as well as the pipelining principle and process. It suggests that the direction of development of coal preparation plant process pipeline design be directed towards the adoption of the 3 - dimensional design mode. Finally, the points requiring special attention in the process of the design and installation of the piping system in proper coal preparation plant are summarized. The experience gained in this respect may serve as a valuable reference for the design of pipework in other plants.
作者 叶慧峰
出处 《选煤技术》 CAS 2016年第4期80-82,共3页 Coal Preparation Technology
关键词 动力煤 选煤厂 工艺管道 设计 建议 power coal coal preparation plant process pipework design suggestion
  • 相关文献

参考文献10

二级参考文献38

共引文献90

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部