期刊文献+

拉洛水利枢纽沥青混凝土心墙坝设计研究 被引量:2

Design of Laluo Dam with asphalt concrete core wall
在线阅读 下载PDF
导出
摘要 西藏拉洛水利枢纽及配套灌区工程地处高寒高海拔地区,大坝是其重要的建筑物。经过多年系统研究,从工程地形地质条件、总体布置、施工和投资等方面综合比较,同时考虑当地恶劣的气候条件对工程耐久性的影响,拉洛水利枢纽大坝设计选择上坝址的沥青混凝土心墙坝方案。介绍了大坝结构设计研究成果,相关成果和思路可供其他工程借鉴。 Laluo Multipurpose Hydraulic Project and Counterpart Irrigation Scheme is located at high altitude and cold zone where its main structure Laluo Dam is built. Thanks to years of systematic studies, the project has conducted comparative analysis on geological and topographical?conditions, general layout, construction and cost and investment.Considering bad weather conditions on the dam site and its impact on the durability of the dam, the type of asphalt concrete core wall dam is designed. Research results of dam structure design are reviewed that can be referenced by other similar projects in China.
出处 《中国水利》 2016年第20期39-41,57,共4页 China Water Resources
关键词 拉洛 沥青 心墙坝 轴线 坝型 大坝设计 Laluo asphalt core-wall dam axis dam type dam design
  • 相关文献

同被引文献10

引证文献2

二级引证文献17

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部