某铀矿掘进设备的合理配置

Reasonable distribution scheme of excavating equipment in a uranium mine
在线阅读 下载PDF
导出
摘要 井巷工程掘进在矿山生产中占有重要的位置,采用合理的掘进方案可以使月进尺大幅度提高,目前在各矿山使用的掘进方案有很多,选择一种适合矿山的掘进方案至关重要。结合多年的矿山实际工作经验,对快速掘进设备配套方案进行探讨和比选,并在某铀矿190m中段开拓工程进行实践,取得了较好的效果,可供类似生产条件的矿井生产开发参考。 The shaft and lane engineering has an important role in mine production. Reasonable pro-grams for excavating may make drilled footage per month to be improved by a large margin. At pres-ent, there are lots of programs for excavating in every mine. Therefore, how to choose an appropriate scheme is vital. Combining the practical work experience of the mine for several years in this paper, the matching programs for rapid excavating and equipment were discussed and compared. Meanwhile, the application of the reasonable distribution third scheme was put into practice in the engineering at middle of 190 meters, and better effects were got. Therefore,it can also be acted as the reference for similar mine production.
出处 《铀矿冶》 CAS 2016年第4期244-247,共4页 Uranium Mining and Metallurgy
关键词 掘进设备 配置方案 高效率 excavating equipment distribution scheme high efficiency
  • 相关文献

参考文献3

二级参考文献11

共引文献7

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部