在软土地层中,针对小净距盾构隧道施工的地表沉降规律分析,对保证安全施工与控制地表沉降具有重要的意义.以苏州地铁4号线软土地层为例,根据现场条件,设计监测断面,对比单洞与双洞施工的地表沉降的变化规律,并进行分析,得出了以下结论:后行洞施工对先行洞的影响是一个挤压、剪切与拉伸的过程,地表沉降量也随之增减;随着后行洞掌子面向前推进,先行洞地表土体纵、横向沉降量先增大和后减小;先行洞施工后形成的扰动圈,使得后行洞的地表沉降量始终大于先行洞的沉降量.
In the soft soil layer, the analysis of the ground surface settlement in tunnel's shield con- struction,it was of great significance to ensure the safe construction and control of ground settlement.Tak- ing the soft soil layer of Suzhou Metro Line 4 as an example,according to the field condition and the moni- toring section design,compared with the single hole and double hole construction of surface subsidence's change law, the following conclusions were drawn: the influence of the tunnel construction of the second hole on the first hole was a process of extrusion,shearing and stretching,and surface subsidence were also increased or reduced;along with the second tunnel's construction,the first hole's vertical and lateral settlement of the ground surface increased first and then decreased ~ after the first hole construction,it formed a disturbance ring, so that the surface settlement of the second tunnel was always greater than the amount of the first hole settlement.
出处
《河北大学学报(自然科学版)》
CAS
北大核心
2016年第5期455-461,共7页
Journal of Hebei University(Natural Science Edition)
基金
河北省教育厅青年基金资助项目(QN2016252)
河北大学中西部提升综合实力专项资金资助项目
国家自然科学基金资助项目(11502065)
关键词
软土地层
小净距隧道
盾构施工
地表沉降
soft soil layer
small clear distance tunnel
shield construction