摘要
常规的循环水泵房进水流道设计中未使用横梁。本文以某个实际工程为例,介绍了1种新的设计方法,即在循环水泵房进水流道墙壁间加设横梁,在满足流道水流流态稳定、水力损失增加较少等要求的前提下,降低了工程造价。方案实施后设备运行平稳,实际工程应用效果表明该方案切实可行。
The beam is not used on the conventional design of water flow channel inthe circulating water pump house. The author taking an actual project as an example,introduced one kind of new design method, that was, the wall of the inlet flow channel ofthe circulating water pump house was equipped with a cross beam. Under the preconditionof satisfying the requirement of stable flow and hydraulic loss, the engineering cost wasreduced. After the implementation of the plan, the equipments ran smoothly, and thepractical engineering application results showed that the scheme was feasible.
作者
赵耀
马晓宇
ZHAO Yao MA Xiaoyu(Inner Mongolia Power Survey & Design Institute Co.,Ltd., Hohhot 010020. China Inner Mongolia Baotou Vocational Technical College, Baotou 014030, China)
出处
《内蒙古电力技术》
2016年第4期73-77,共5页
Inner Mongolia Electric Power
关键词
循环水泵房
进水流道
横梁
物理模型试验
水力损失
circulating water pump house
inlet channel
crossbeam
physical model test
hydraulic loss