期刊文献+

循环水泵房进水流道横梁的设计及应用

Design and Application of Crossbeam on Inlet Channel in Circulating Water Pump House
在线阅读 下载PDF
导出
摘要 常规的循环水泵房进水流道设计中未使用横梁。本文以某个实际工程为例,介绍了1种新的设计方法,即在循环水泵房进水流道墙壁间加设横梁,在满足流道水流流态稳定、水力损失增加较少等要求的前提下,降低了工程造价。方案实施后设备运行平稳,实际工程应用效果表明该方案切实可行。 The beam is not used on the conventional design of water flow channel inthe circulating water pump house. The author taking an actual project as an example,introduced one kind of new design method, that was, the wall of the inlet flow channel ofthe circulating water pump house was equipped with a cross beam. Under the preconditionof satisfying the requirement of stable flow and hydraulic loss, the engineering cost wasreduced. After the implementation of the plan, the equipments ran smoothly, and thepractical engineering application results showed that the scheme was feasible.
作者 赵耀 马晓宇 ZHAO Yao MA Xiaoyu(Inner Mongolia Power Survey & Design Institute Co.,Ltd., Hohhot 010020. China Inner Mongolia Baotou Vocational Technical College, Baotou 014030, China)
出处 《内蒙古电力技术》 2016年第4期73-77,共5页 Inner Mongolia Electric Power
关键词 循环水泵房 进水流道 横梁 物理模型试验 水力损失 circulating water pump house inlet channel crossbeam physical model test hydraulic loss
  • 相关文献

参考文献5

二级参考文献15

  • 1邱静,黄东,黄本胜,练伟航.某大型泵站机组振动原因分析及防振临时工程措施[J].中国农村水利水电,2004(12):103-105. 被引量:10
  • 2吴持恭.水力学[M].北京:高等教育出版社,2008.
  • 3DL/T957-2005,火力发电厂凝汽器化学清洗及成膜导则[S].
  • 4吉红香.某核电厂一期工程循环水泵房进水流道物理模型试验研究[R].广州:广东省水利水电科学研究院,2009.
  • 5邱静,杜涓,黄本胜,等.汕尾发电厂循环水泵房进水前池及流道水力性能试验研究[R].广州:广东省水利水电科学研究院,2004.
  • 6邱静,杜涓,黄本胜,等.台山发电厂一期丁程循环水泵进水流道水力性能试验研究报告[R].广州:广东省水利水电科学研究院,2002.
  • 7国家电力公司电力规划设计总院.DLGLl50-1999火力发电厂循环水泵房进水流道及其布置设计技术规定[S].1999.
  • 8DL/T794-2001.火力发电厂锅炉化学清洗导则[S].[S].,..
  • 9李文军.水稳剂与硫酸组合处理工艺在循环水处理中的应用[J].陕西电力,2007,35(9):42-44. 被引量:3
  • 10张亚维,甘一萍.曝气生物滤池在污水深度处理中的研究进展[J].给水排水动态,2011(2):22-24. 被引量:10