高桩框架钻孔灌注桩基础在水电站出线铁塔中的应用

Introduction the application of high pile frame foundation in hydropower station transmission tower
在线阅读 下载PDF
导出
摘要 锦屏二级水电站地下厂房需要在雅砻江岸坡上立终端塔,铁塔基础外露基岩高度高达18-30m,基础顶部的水平荷载所引起的水平位移较大,是基础结构尺寸的控制性因素,常规的基础型式如掏挖式或大开挖式已不适用。通过对比分析最终采用高桩框架钻孔灌注桩基础,可以有效的减小基础顶部水平位移,且施工快速方便经济效益较好。对该基础的荷载取值及基础设计进行了详细介绍,可作为同类工程的参考。 The underground powerhouse of JinPing Ⅱ hydropower station needs to erect towers in the bank of Yalong river, the height of tower foundation out of bedrock is reach up to 18-30 m,it results in large horizontal displacement on the top of foundation caused by horizontal loads. Horizontal displacement on top is the controlling factor of foundation structure size, the common foundation type like excavation type or pad chimney type are not appiicable. By comparing the analysis, finally choose high pile frame foundation, it can effectively reduce the horizontal displacement on the top, also the construction method is convenient, fast and good economic benefits. The detailed load determination and foundation design are introduced below, also it can be taken as reference to the similar projects.
出处 《南水北调与水利科技》 CAS CSCD 北大核心 2015年第B02期261-262,272,共3页 South-to-North Water Transfers and Water Science & Technology
关键词 高桩框架 钻孔灌注桩基础 出线铁塔 水电站 high pile frame bored piles foundation transmission tower hydropower station
  • 相关文献

参考文献2

  • 1DL/T5219-2005,架空送电线路基础设计技术规定[S].
  • 2JGJ 94-2008,建筑桩基技术规范[S].

共引文献1220

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部