摘要
通过数学规划的方法对抽水蓄能电站引水系统的经济洞径进行优选 。
In regular engineering practice,the diameter sequence of power tunnel is conventionally determined with the method of alternatives comparison,but the result may not be the optimal one.In this paper,factors influencing the diameter of power tunnel for pumped storage power plant are considered and the objective function is obtained.With the method of nonlinear programming,computer programme in common use for power tunnel optimization of pumped storage power plants is designed and the result turns to be satisfactory.
出处
《武汉大学学报(工学版)》
CAS
CSCD
北大核心
2002年第4期60-63,共4页
Engineering Journal of Wuhan University
关键词
抽水蓄能电站
引水隧洞
经济直径
优化
pumped storage power plants
power tunnel
economical diameter
optimization