摘要
根据超缓凝混凝土在深填海区钻孔咬合桩在实际工程中的应用实例,阐述了应对填海区特殊地质超缓凝混凝土浇筑过程中所采取的的控制技术。通过对生产和浇筑环节的严格管理,保证了施工质量,为今后类似工程提供了经验。
Based on the application cases of super concrete retarder used into the secant piling of deep reclamation, the technical points of super concrete retarder pouring which replied the particular geology zone of deep reclamation are claimed.Imposing strict conU:ol on production cycles and irrigation cycles to ensure that the construction quality is improved, and also a reference for the similar projects can be provided.
出处
《混凝土》
CAS
北大核心
2016年第4期147-149,共3页
Concrete
关键词
超缓凝混凝土
深填海区
咬合桩
super concrete retarder
deep reclamation
secant piling