禹门口东扩一级泵站出水池遥测站设计方案

Design Scheme of Telemetry Station of Outlet Sump of the First Pumping Station in Yumenkou Water Lifting Eastern Expansion Project
在线阅读 下载PDF
导出
摘要 文中对禹门口提水东扩工程一级泵站出水池遥测站遥测系统数据传输方式及供电方式进行了方案比较,并着重介绍了太阳能供电系统的框架构成,对太阳能板、蓄电池及充电控制器进行了选择和计算。通过合理的太阳能供电系统设计,保证了出水池遥测站数据的有效传输,确保了两级泵站的流量调配准确,对全线信息化安全稳定运行起着关键作用。 Data transmission mode and power supply mode of telemetry system that was installed in telemetry station of outlet sump of the first pumping station in Yumenkou Water Lifting Eastern Expansion Project were compared in this research. The structure of the solar power supply system was focused in this paper. The capacities of photovoltaic cell,accumulators and charge controller were calculated,and the types of these equipments were selected. Reasonable design of solar power supply system ensured the effective data transmission and accuracy flow allocation of two stages of pumping stations,and played a key role in safe and stable operation of information systems along the whole line.
作者 李祖杰
出处 《山西水利科技》 2016年第1期6-8,共3页 Shanxi Hydrotechnics
关键词 出水池 数据传输 供电方式 太阳能供电 outlet sump data transmission power supply mode solar power supply
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部