某高速公路9-20m大桥左幅在桥面及附属工程施工完成后,成功采用整体顶升的方案调整桥面横坡。本文结合现场实际施工介绍了如何实施整体顶升方案,旨在为类似工程提供一定的施工经验。
A highway bridge 9-20m pieces left after the bridge and ancillary works construction is completed, the successful use of the program to adjust the overall lifting bridge cross slope.In this paper, the actual construction site describes how to implement the overall lifting program, designed to provide some experience in the construction of similar projects.