期刊文献+

我国重载铁路速度目标值探讨 被引量:3

Study on China Heavy-haul Railway Target Speed
在线阅读 下载PDF
导出
摘要 重载铁路运输品类为大宗货物,其牵引质量大、轴重大,重载铁路速度目标值的确定有别于普通货运铁路,需要深入探讨。从行车组织、路基、桥梁、轨道、供电等方面,对重载铁路速度目标值为80、100、120 km/h时分别进行计算和对比,并结合国内外运营实际进行分析。对比分析表明,不同速度目标值对轨道、路基、桥梁、供电等影响不大,但当速度目标值大于100 km/h时,机车牵引和制动难以实现,重载货物列车设计行车速度等于或小于100km/h是适宜的。 Heavy-haul railway with large tractive tonnage and big axle load serves to carry bulk cargo and its target speed differs that of conventional freight railway. This paper conducts the calculation and comparison of 80, 100 and 120 km/h target speed respectively in terms of traffic organization, subgrade, bridge, track and power supply, and analysis is made based on operation practices at home and abroad. The results show that different target speeds pose little impact on the track, subgrade, bridge and power supply, but locomotive traction and braking can be hardly fulfilled when speed exceeds 100 km/h. Thus, the running speed of heavy haul train is expected to be 100 km/h and less.
作者 赵斗
出处 《铁道标准设计》 北大核心 2016年第4期1-4,共4页 Railway Standard Design
关键词 重载铁路 速度目标值 牵引质量 轴重 Heavy-haul railway Target speed Tractive tonnage Axle load
  • 相关文献

参考文献4

二级参考文献10

共引文献165

同被引文献25

  • 1战家旺,夏禾,安宁.基于列车动力响应的铁路桥梁损伤诊断方法[J].中国铁道科学,2012,33(3):35-39. 被引量:5
  • 2中华人民共和国铁道部.TBl0001-2005铁路电力牵引供电设计规范[S].北京:中国铁道出版社,2005.
  • 3中华人民共和国铁道部.TB/T2075.2-2010电气化铁路接触网零部件[S].北京:中国铁道出版社,2010.
  • 4中华人民共和国铁道部.TB/T2075.5-2010电气化铁路接触网零部件[S].北京:中国铁道出版社,2010.
  • 5中华人民共和国铁道部.TB/T2075.12-20IO电气化铁路接触网零部件[S].北京:中国铁道出版社,2010.
  • 6中华人民共和国铁道部.TB/T2075.3-2010电气化铁路接触网零部件[S].北京:中国铁道出版社,2010.
  • 7中华人民共和国铁道部.TB/T2075.1l-2010电气化铁路接触网零部件[S].北京:中国铁道出版社,2010.
  • 8铁道第三勘察设计院集团有限公司.新建山西中南部铁路通道工程施工图·电气化[z].天津:铁道第三勘察设计院集团有限公司.2013.
  • 9铁道第三勘察设计院集团有限公司.新建铁路张家口至唐山线施工图·电气化[Z].天津:铁道第三勘察设计院集团有限公司.2013.
  • 10闫晓春,张金月,晋杰.环行试验基地重载试验线建设的研究[J].铁道建筑,2008,48(12):93-96. 被引量:4

引证文献3

二级引证文献6

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部