期刊文献+

基于全流程管控的非项目类物资管理 被引量:2

Non Project Material Management Based on Whole Process Control
在线阅读 下载PDF
导出
摘要 非项目类物资包括消耗类物资、低值易耗品、备品备件,具有物资需求零散、消耗定额难测算、领用后的库存难管控、难回收、易变现、好挪用等特点,厦门供电公司实施全流程管控的物资管理创新,从单纯偏重采购管理向上延伸到全面预算管理、采购标准化目录、消耗定额标准,向下覆盖到领用、存储、盘点、调配、回收等全流程管理,解决了"老大难"的物资管理问题。 Non project materials includes the consumption materials,low value consumables, spare parts, with the features of material demand scattered, consumption quota difficult to measure, receive the inventory control of difficult, difficult recovery, changeable, misappropriation etc., Xiamen power supply company implementation of whole process control of material management innovation, from a simple emphasis on procurement management to on extend to the comprehensive budget management, standard procurement catalog, consumption quota standards down to cover the collar, storage, inventory, deployment, recovery of the whole process management, break the "long - standing" materials management problems.
出处 《物流工程与管理》 2016年第1期47-48,共2页 Logistics Engineering and Management
关键词 全流程 管控 非项目 物资 full process control non project materials
  • 相关文献

参考文献3

  • 1朱国华.ERP应用和实施的探讨[J].科技创新导报,2008,5(4):30-30. 被引量:9
  • 2Hans-Christian Pfohl,张计划,李铁倩等译.物流管理前沿——实践、创新、前景[M].北京:机械工业出版社,2004:173-177.
  • 3RonaldHBallou 王晓东 译.企业物流管理-供应链的规划、组织和控制[M].北京:机械工业出版社,2002.248-249.

二级参考文献3

共引文献9

同被引文献2

引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部