三峡左岸电站机组检修排水控制系统的设计 被引量:3

Design of the Draining and Controlling System for Sets Repair at the Three Gorges Left Bank Power Station
在线阅读 下载PDF
导出
摘要 三峡左岸电站机组检修排水控制系统选用西门子PLC为核心控制单元,遵循"运行次数最少优先启动,停泵时先启先停"的控制逻辑,控制6台大功率深井泵的轮换选择和可靠运行,从而满足左岸机组检修排水的要求。 The draining and controlling system for sets repair at the Three Gorges Left Bank Power Station uses Siemens PLC as the core control unit, and follows the control logic of "preferential start of the set with the least number of runs, first start first stop for termination of pumping" to control the rotational selection and reliable operation of six high-power deep well pumps, thus satisfying the requirements for overhaul drainage of the sets installed on the left bank.
出处 《电气自动化》 2016年第1期84-86,90,共4页 Electrical Automation
关键词 深井泵 检修排水 PLC控制系统 西门子 三峡左岸电站 deep well pump drainage for overhaul PLC control system Siemens Three Gorges Left Bank Power Station
  • 相关文献

参考文献6

二级参考文献12

共引文献43

同被引文献11

引证文献3

二级引证文献7

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部