摘要
为提高数据机房工程的施工效率与管理水平,利用建筑信息模型(BIM)技术进行三维建模,建立用于进行虚拟施工和施工过程控制的3D深化模型。利用Navisworks软件实现机房工程3D模型与施工进度计划及后期运维信息融合,实现数据机房4D施工模拟。通过4D施工技术集成机房施工过程各阶段和各方面的信息,补充深化设计,优选可视化方案以解决碰撞冲突,取得了实际成效。
In order to improve the construction efficiency and management level of the data room, the 3D model is built by using the building information model (BIM) technology for 3D modeling. Using Navisworks and other software to achieve the 3D model of the engine room and the construction progress plan and the late operation and maintenance information integration, the data room 4D construction simulation. Through the 4D construction technology integrated computer room construction process each stage and various aspects of the information, to deepen the design, optimize the visualization scheme to solve the collision conflict, achieved the actual results.