摘要
2001-2005年,水利部组织北京、河北、青岛、沈阳等4省(市)实施了世行贷款节水灌溉一期项目,共完成项目投资16.2亿元,其中利用世行贷款7 400万美元,项目区共发展节水灌溉面积10.47万hm^2。2006年6月圆满完成各项建设任务和投资计划,取得了良好的经济、社会和生态环境效益。2012年9月,世行贷款节水灌溉二期项目正式启动实施,该项目计划总投资10.9亿元,其中利用世行贷款8 000万美元,项目执行期5年。计划在河北、宁夏和山西3省(自治区)发展节水灌溉面积5.93万hm^2。目前该项目执行情况良好,各项工作进展顺利。
From 2001 to 2005, Ministry of Water Resources implemented Water Conservation Project in Beijing, Hebei, Qingdao, and Shenyang 1.62 billion yuan investment has been completed, of which the World Bank loan is 74 million dollar, and 104 700 hm2 Wa ter-saving irrigation area has been developed. In June 2006, construction tasks and investment plans have been completed successful ly, and achieved good economic, social and ecological benefits. In September 2012, Water Conservation Project Ⅱ is launched offi- cially, total investment plan is 1.09 billion yuan, which includes 80 million dollar loan. Water Conservation Project Ⅱ plans to devel op water-saving irrigation area of 59 300 hm2 in Hebei, Ningxia and Shanxi provinces (autonomous region). At present, the imple mentation is in good condition, and every work goes well.
出处
《中国农村水利水电》
北大核心
2015年第12期46-48,共3页
China Rural Water and Hydropower
关键词
世界银行
贷款
节水灌溉
项目成果
World Bank
Loan
Water saving irrigation
Project achievements