期刊文献+

巴基斯坦某多泥沙河流电站以库代池方案研究 被引量:2

Study of Reservoir Scheme Designed to Desilt A Hydropower Station on A Sediment- laden River in Pakistan
在线阅读 下载PDF
导出
摘要 对巴基斯坦某多泥沙河流上建设的引水发电枢纽的引水防沙问题展开研究,模拟了沉砂池的效率。提出"以库代池",即采用"壅水沉沙,敞泄排沙"运用方式的非工程措施来替代修建沉沙池的工程措施,来防止推移质以及悬移质中的粗粒径泥沙进入取水口,使电站过机多年平均含沙量和多年平均粗粒径含沙量均限定于允许值范围内,达到减少对水轮机及过流部件磨损的目的。 For the water diversion type of a power generation system to be built on a sediment-laden river in Pakistan, a river diversion measure has been studied to control sediment, including simulating the efficiency of a desilting basin.Thus a method serving the above purpose is generated, i.e."using a reservoir rather than a desilting basin".More exactly, a non-engineering measure, known as that sediment is settled in and discharged from a reservoir during water storage and release periods respectively, is adopted instead of a conventional desilting basin to prevent the bottom load and coarse grain of suspended load from flowing into intake.With the proposed measure, both mean annual sediment concentration and its coarse particle concentration through the units will be limited to a permitted range, and the abrasion of sediment to the turbines and relevant components will be reduced subsequently.
作者 王晓峰 徐哲
出处 《广东水利水电》 2015年第9期4-6,25,共4页 Guangdong Water Resources and Hydropower
关键词 多泥沙河流 沉沙池 以库代池 推移质 悬移质 sediment-laden river desilting basin using a reservoir rather than a desilting basin bottom load suspended load
  • 相关文献

参考文献3

  • 1水利部山西水利水电勘测设计研究院.SL269-2001水利水电工程沉沙池设计规范[S].北京:中国水利水电出版社,2001:30-36.
  • 2国家电力公司成都勘测设计研究院.DL/T5107-1999水电水利工程沉沙池设计规范[S].北京:中国电力出版社,2000.
  • 3国家电力公司水电水利规划设计总院.DL/T5089--1999水电工程泥沙设计规范[S].北京:中国电力出版社.1999.

共引文献1

同被引文献13

引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部