盖下坝水电站为混凝土双曲拱坝,共分9个坝段,布置8条横缝。本文主要介绍上述坝体接缝灌浆的施工方法、主要成果及在实际施工中的一些经验总结。
The Gaixiaba hydropower station is a double curvature concrete arch dam, which is divided into nine dam section and arranged eight transverse joints. The paper mainly introduces the grouting construction methods and the main results for the joints of dam body and the experiences summary in practical construction.
出处
《东北水利水电》
2015年第12期19-20,65,共3页
Water Resources & Hydropower of Northeast China
关键词
拱坝
接缝灌浆施工
盖下坝水电站
arch dam
joint grouting construction
Gaixiaba hydropower station