摘要
本文详细介绍了该工程的整个基础设计过程 ,针对该场地的地质情况 ,对主楼、地下室车库分别采用了桩基和片筏基础 ,并介绍了基坑支护方案。
This article presents the foundation design of the building in details.According to the geological condition beneath the building,pile foundation and raft foundation are adopted respectively for tower part and basement of the building.In addition, the pit supporting system of the project is presented in brief. \[
出处
《建筑技术开发》
2002年第8期28-29,共2页
Building Technology Development