期刊文献+

PLC液压控制系统在桥梁整体同步顶升中的应用 被引量:6

Application of PLC Hydraulic Control System in Synchronous Jacking of the Whole Bridge
在线阅读 下载PDF
导出
摘要 新建桥梁与原有旧桥梁的对接如何进行,尤其是对刚投入使用不久的桥梁改造,应从经济、环保、交通、使用价值安全等多方面考虑。桥梁整体可靠程度将直接影响桥梁结构的安全度和耐久性,PLC液压控制系统能够有效解决桥梁上部结构在顶升、降落过程中同步位移的难题,保证桥梁的整体性。 For how the new bridge dock with the old bridge, especially for the bridge just put into use for a little time, it should consider from many aspects, such as the economic, environmental protection, transportation, use value safety. The reliability of the whole bridge will directly affect the safety and durability of the bridge, PLC hydraulic control system can effectively solve the synchronous displacement problems in jack-up and landing of the bridge superstructure and ensure the integrity of bridges.
出处 《价值工程》 2015年第21期118-121,共4页 Value Engineering
关键词 PLC液压控制 旧桥改造 桥梁整体同步顶升 PLC hydraulic control old bridge transforming synchronous jacking of the whole bridge
  • 相关文献

参考文献8

二级参考文献27

共引文献109

同被引文献47

引证文献6

二级引证文献5

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部