汽车试验室研发项目组合资源配置研究 被引量:1

Research on Resource Allocation for R&D Project Portfolio in Automobile Test Center
在线阅读 下载PDF
导出
摘要 文章以项目组合管理理论为指导,结合汽车行业研发的现有流程和特点,分析资源与产品研发型项目的关系,并研究了资源配置过程中出现的问题。分析试验室的资源配置情况,引入资源配置的方法和模型,如元启发式算法、遗传算法等解决资源配置问题。结合公司的实际情况,匹配本企业的项目管理流程,文章就长期试验计划应用遗传算法模拟资源需求,最终能够达到及时、准确、高效的资源配置,保障项目的资源需求并按时完成。 Based on portfolio management theory,combined the existing process and characteristics during auto industry development,this dissertation analyzes the relations between testing resource and R&D projects. Further more, this dissertation analyzes some issues exiting in the process of resource allocation such as resource constraints, resource congestion and some conflicts in multi-project. The paper analyzes some resource allocation situation in testing center, integrated with some resource allocation methods and models to solve the problem. Consider with real situation, this dissertation presents to manage test resource separating with different duration. Focued on long term testing resource plan with using genetic algorithm simulation so as to be ready much earlier. And the simulation result is one of most important factors for testing center resource extension.
作者 周伶
出处 《江苏科技信息》 2015年第14期38-41,共4页 Jiangsu Science and Technology Information
关键词 汽车试验室 项目组合管理 资源配置 automobile test center project portfolio management resource allocation
  • 相关文献

参考文献4

二级参考文献21

  • 1张静文,徐渝,柴国荣.项目进度中的离散时间-费用决策问题研究[J].系统工程学报,2007,22(2):122-127. 被引量:10
  • 2HINDELANG T J, MUTH J F. A dynamic programming algorithm for decision CPM networks[J]. Operations Research, 1979, 27(2) :225-241.
  • 3PRABUDDHA D E, DUNNE E J, GHOSH J B, et al. Complexity of the discrete time-cost tradeoff problem for project networks[J].Operations Research, 1997, 45(2) :302-306.
  • 4DEINEKO V G,WOEGINGER G J. Hardness of approximation of the discrete time cost tradeoff prohlem[J].Operations Research Letters, 2001, 29 (5) :207-210.
  • 5PATTERSON J H, HARVEY R T. An implicit enumeration algorithm for the time/cost tradeoff problem in project network analysis[J]. Foundations of Control Engineering, 1979, 4(2):107-117.
  • 6DEMEULEMEESTER E, HERROELEN W, ELMAGHRABY S E. Optimal procedures for the discrete time/cost trade off problem in project networks[J]. European Journal of Operational Research, 1996, 88(1) :50-68.
  • 7DEMEULEMEESTER E, DE REYCK B, FOUBERT B, et al. New computational results on the discrete time/cost trade -off problem in project networks[J]. Journal of the Operational Research Society, 1998, 49(6):1153-1163.
  • 8ERENGUC S S, AHN T, CONWAY D G. The resource constrained project scheduling problem with multiple crashable modes: an exact solution method[J]. Naval Research Logistics, 2001, 48(2):107-127.
  • 9SKUTELLA M. Approximation algorithms for the discrete time-cost tradeoff problem[J]. Mathematics of Operations Research, 1998, 23(4) :909-929.
  • 10ELMAGHRABY S E, KAMBUROWSKI J. The anaylsis of activity network under generalized precedence relations[J]. Management Science, 1992, 38(9):1245 -1263.

共引文献115

同被引文献2

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部