接驳缓冲设置中的独立时差策略 被引量:3

Feeding Buffer Sizing Approach Based on Independent Float
在线阅读 下载PDF
导出
摘要 加入接驳缓冲后可能导致关键链与非关键链产生资源冲突,非关键链溢出等问题,使得关键链调度计划的制定再次复杂化。为优化接驳缓冲的计算,在根方差法的基础上,运用独立时差这一项目网络提供的隐性安全时间,区分非关键链上的活动;并对非关键链上拥有独立时差的活动,改变Goldratt提出的所有非关键活动最晚执行策略,构建考虑独立时差的接驳缓冲设置方法。通过仿真实验,对采用不同接驳缓冲设置法得到的关键链调度计划进行比较;结果表明,新方法能减少接驳缓冲设置引发的问题,并较好地改善了项目工期,项目执行绩效。 Inserting feeding buffer in non-critical chain may lead to new problems, such as new resource conflict, non-critical chain overflow, etc. These problems further complicate the resource constrained pro- ject scheduling. In order to optimize the sizing of feeding buffer, based on root square error method (RSEM) , independent float is applied to solve the feeding buffer setting in critical chain project manage- ment theory. Using independent float wish is the hidden safety time in project network, the activities on non-critical chain are differentiated. Aiming at the non-critical activities which have independent float, and changing the latest time execution strategy proposed by Goldratt, the new feeding buffer sizing ap- proach is built. At the end, experimentation of different plans using various feeding buffer sizing methods has been done by means of simulation for contrastive analysis. Results show that the new approach reduces the problems caused by the feeding buffer inserting and improves the due date and execution performance of project.
作者 王艺 崔南方
出处 《工业工程》 2015年第2期127-132,141,共7页 Industrial Engineering Journal
基金 国家自然科学基金资助项目(71271097) 国家自然科学基金青年科学基金资助项目(71201119)
关键词 关键链项目管理 独立时差 非关键链 接驳缓冲 critical chain project management independent float non-critical chain feeding buffer
  • 相关文献

参考文献25

  • 1W Herroelen, R Leus. Identification and illumination of popu- lar misconception about project scheduling and time buffering in a resource-constrained environment [ J ]. Journal of the Op- erational Research Society ,2005,56( 1 ) : 102-109.
  • 2EliyahuGoldratt.Criticalchain:突破项目管理的瓶颈[M].北京:电子工业出版社,2006.
  • 3Tyson R, Browning, Ali A, Yassine. Resource-constrained uhi-project scheduling: Priority rule performance revisited [J]. International Journal of Production Economics, 2010, 126(2) :212-228.
  • 4Kuo Tsai-chi, Chang Sheng-Hung, Huang Shang-nan. Due- :late performance improvement using TOC' s aggregated time 3uffer method at a wafer fabrication factory [ J ]. Expert Sys- eros with Application,2009,36(2) :1783-1792.
  • 5John E Hebert, Richard F Deckrp. Combining contemporary md traditional project management tools to resolve a project cheduling problem [ J]. Computers & Operations Research, 5011,38(1) :21-32.
  • 6Willy Herroelen, Roel Leus. On the merits and pitfalls of crit- cal chain scheduling [ J ]. Journal of Operations Manage- nent,2001,19 (5) : 559-577.
  • 7Willy Herroelen, Roel Leus, Erik Demeulemeester. Critical hain project scheduling: do not oversimplify [ J ]. Project VIanagement Journal, 2002,33 (4) :48-60.
  • 8Tzvi Raz, Robert Barnes, Dov Dvir. A critical look at critical chain project management [ J ]. Project Management Journal, 2003,34(4) :24-32.
  • 9Herman Steyn. An investigation into the fundamentals of criti- cal chain project scheduling[ J ]. International Journal of Pro- ject Management,2000,19(6) :363-369.
  • 10单汨源,刘永,任斌,张人龙.基于不确定因素视角的关键链缓冲区研究[J].软科学,2009,23(8):26-29. 被引量:15

二级参考文献91

共引文献184

同被引文献22

引证文献3

二级引证文献21

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部