大型高炉出铁场液压站共用蓄能器站的实现与改进 被引量:1

Realization and Improvement of Shared Accumulator Station in Large Blast Furnace Casthouse Hydraulic Station
在线阅读 下载PDF
导出
摘要 分析了在满足炼铁工艺要求的情况下,大型高炉的出铁场液压系统中,互为备用的两套高炉出铁场液压站,共用一套蓄能器站的原理及实现方法,该方法具有可行性,并利于高炉工程在设计阶段的总图布置和节省投资。结合互为备用液压站共用蓄能器站,现场调试与实际应用情况,对该系统的优缺点进行分析,并针对其缺点提出了有效的改进方案。 The principles and the realization method of two sets of large blast furnace casthouse hydraulic station u- sing one set of accumulator station are analyzed. The method is feasible and beneficial to the general layout in the design phase of the project and investment saving of blast furnace. Through the application and the debugging situa- tion of this hydraulic system, advantages and disadvantages of the system are analyzed, and some effective impro- ving scheme is put forward.
出处 《液压与气动》 北大核心 2015年第3期99-101,共3页 Chinese Hydraulics & Pneumatics
关键词 高炉 出铁场液压站 互为备用 蓄能器站 Blast furnace, Casthouse hydraulic station, Mutual standby, Accumulator station
  • 相关文献

参考文献3

二级参考文献12

共引文献29

同被引文献7

引证文献1

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部