结合滨海站市政道路工程施工,介绍紧邻铁路路基的泵房沉井下沉施工中产生偏移的原因以及纠偏和其它质量控制措施,有效的保证了沉井施工顺利完成。
With the construction of municipal road projects around the Binhai Railway Station as a practical example,some key points of construction quality control for sinking open caissons adjacent to the roadbed of existing railways are introduced in the paper,with the causes for offset,the treating measures and other quality control measures adopted in the construction presented.All those measures help effectively ensure the smooth completion of the sinking construction of the open caissons.
出处
《国防交通工程与技术》
2015年第2期78-80,共3页
Traffic Engineering and Technology for National Defence
关键词
沉井
下沉
偏移
open caisson
sinking
offset