期刊文献+

6MW风力发电机组主机架、轮毂铸件的生产 被引量:3

Production of Main Machine Frame and Hub Casting Used on 6 MW Wind Power Set
在线阅读 下载PDF
导出
摘要 介绍了6 MW风力发电机组主机架、轮毂铸件的结构及技术要求。采用中频感应电炉熔炼,用冲入法进行球化处理,采用树脂砂造型,并采用多分型面和底注浇注系统的铸造工艺。通过严格控制铁液的CE、w(RE)和w(Mg)量,加入Sn、Sb或Bi等微量元素,对铁液进行预处理,以及包内孕育和随流孕育,成功生产了6 MW风力发电机组的主机架和轮毂球墨铸铁件。 The configuration and technical requirements of the main machine frame and hub castings used on the 6 MW wind power set were introduced. The medium frequency induction furnace was used for melting, the pour-over process was used for nodularizing treatment, furan resin sand was used for molding, and the casting method with multiple patting faces and bottom gating system was adopted. By strictly controlling CE, RE and Mg contents of the iron melt, adding trace elements such as Sn, Sb or Bi,pre-treating the base iron melt as well as conducting ladle inoculation and stream inoculation,the main machine frame and hub castings were successfully produced.
作者 苟华强
出处 《现代铸铁》 CAS 2015年第1期38-41,共4页 Modern Cast Iron
关键词 球墨铸铁 主机架 轮毂 厚大断面 铸造工艺 nodular cast iron main machine frame hub heavy section casting method
  • 相关文献

参考文献4

二级参考文献19

共引文献35

同被引文献57

引证文献3

二级引证文献21

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部