茅洲河人工湿地工程是深圳市宝安区环境保护和水务局实施珠江流域污染治理的一个工程措施,采用了华南环科所改进型人工湿地碎石床污水处理工艺。文章概述了工程概况及工艺调试内容,介绍了工艺调试过程,分析了工程处理效果,阐明了系统处理运行参数控制、异常情况及对策。工程经我局工艺调试和试运行后,达到了设计要求,提升了茅洲河水环境质量。
Maozhou River constructed Wetland engineering is a project that Environmental Protection and Water Affairs Bureau of Shenzhen Baoan District measures for pollution control of Pearl River Basin. The project used the Southern China Central Division improved artificial wetland sewage treatment process of gravel bed. This article summarizes the general situation of the engineering and process debugging contents,introduces the technological debugging process,analyzed the treatment effect,expounds the system processing control of operational parameters and the abnormal situation and countermeasures. The process and test run debug has achieved the design requirements,enhance the Maozhou river water environmental quality.
出处
《环境科学与管理》
CAS
2015年第1期106-109,共4页
Environmental Science and Management
关键词
生化处理
沉淀
人工湿地
工艺调试
处理效果
biochemical treatment
precipitation
constructed wetland
debugging process
treatment effect