跨区域重大工程项目风险相互关系的社会网络分析 被引量:9

Social Network Analysis of Risk Interrelations in Interregional Large-scale Construction Projects
原文传递
导出
摘要 运用社会网络分析的方法,对跨区域重大工程项目风险间相互关系进行了研究和探讨。首先识别出了跨区域重大工程项目的 18个风险因素,通过识别其相互关系、计算可达矩阵构建风险网络。然后计算风险网络的密度、节点中心度和中间中心度,并结合跨区域重大工程项目的特点对计算结果进行分析。最后基于社会网络分析将风险分类,并针对不同类别风险的特点提出不同的风险管理策略。研究对于加深对跨区域重大工程项目风险的认识、提高管理效率和管理质量具有重要意义。 Using Social Network Analysis (SNA),the interrelations among risks of interregional large-scale construction pro-jects are discussed.Firstly,1 8 risk factors of interregional large-scale construction projects are identified.By analyzing the interrelations among these risk factors and calculating the reachability matrix,a risk network can be got.Then the density, degree centrality and between centrality of the risk network are computed,and the results of calculation are analyzed com-bined with the characteristic of the interregional large-scale construction projects.In the end,according to the result of SNA, the risk factors are classified,and different risk management strategies for the different sorts are put forward.The conclusion is very helpful for deepening the understanding of interregional large-scale construction projects risks and improving the effi-ciency and quality of management.
作者 向鹏成 董东
出处 《世界科技研究与发展》 CSCD 2014年第6期674-680,共7页 World Sci-Tech R&D
基金 重庆市社会科学规划重点项目(2013ZDZZ02) 中央高校基本科研业务费(106112012CDJSK5503)资助
关键词 跨区域 重大工程项目 项目风险 风险相互关系 社会网络分析 interregional large-scale construction projects project risk interrelation of risks SNA
  • 相关文献

参考文献21

二级参考文献142

共引文献688

同被引文献77

  • 1张飞燕,张特曼,王泽武.城市地铁施工安全风险评价与控制研究[J].地下空间与工程学报,2019,0(S01):443-448. 被引量:18
  • 2徐军,刘正杨.浅谈如何利用合同防范工程项目风险[J].油气田地面工程,2005,24(2):1-1. 被引量:1
  • 3MATTHEW H, BEHZAD E, PAUL C. Safety risk interactions among highway construction work tasks [ J ]. Construction Management and Economics,2011, (29) :417 - 429.
  • 4REN H. Risk Lifecycle and Risk Relationships on Construction Pro-jects [ J]. International Journal of Project Management, 1994,12 ( 2 ) : 68 -74.
  • 5MARLE F, VIDAL L A, BOCQUET J C. Interactions-based risk clus- tering methodologies and algorithms for complex project management [ J]. International Journal of Production Economics, 2013,142 ( 2 ) : 225 -234.
  • 6LEU S, CHANG C. Bayesian-network-based safety risk assessment for steel construction projects [ J]. Accident Analysis and Prevention, 2013,05 (54) :122-133.
  • 7MARTIN P, RICHARD T, JAY M T, et al. The Application Of QFD Methodology For Mapping Risk Interactions In Project Planning [ J]. Insights to a Changing World Journal ,2011,3 (3) :316-334.
  • 8IYER K C, SAGHEER M. Hierarchical Structuring of PPP Risks U- sing Interpretive Structural Modeling [ J ]. Journal of Construction En- gineering and Management,2010,136(2) :151-159.
  • 9CARON F, VANTHIENEN J, BAESENS B. Comprehensive rule- based compliance checking and risk management with process min- ing [J]. Computers in Industry,2013,64(4) :464-475.
  • 10蓝燕强.高速铁路施工项目风险控制研究[D].成都:西南交通大学,2012.

引证文献9

二级引证文献24

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部