并行多机批调度的混合粒子群算法研究 被引量:2

Research on Hybrid Particle Swarm Algorithm of Parallel Multi-machine Batch Scheduling
在线阅读 下载PDF
导出
摘要 针对调度目标为最小化最大完工时间的并行多机批调度问题,提出了改进的基于批序列编码的混合粒子群算法。在基本粒子群算法的基础上,引入了学习因子二阶振荡、随机权重、最大速度线性递减及自然选择等方法,改善了算法本身易陷入局部最优及早熟收敛等问题,并解决了因引入新的方法造成算法收敛速度慢及寻优能力差等问题。由仿真结果可知:改进的算法均优于常规的粒子群算法,且根据批序列编码的改进算法更优于常规基于工件序列编码的改进算法。 Aiming at minimizing the maximum completion time on the parallel machines,an improved hybrid particle swarm algorithm based on batch sequence encoding was proposed; and basing on the basic particle swarm optimization algorithm,the methods like the second-order oscillative learning factor,the random weight,the maximum speed linear degressive and the natural selection were introduced to solve problems such as falling into local optimum and premature convergence,slow convergence and poor ability of optimization caused by newly-introduced methods.Simulation results demonstrate that the improved algorithm outperforms the normal particle swarm algorithm,and the improved algorithm based on batch sequence works better than the improved algorithm based on workpiece sequence.
出处 《化工自动化及仪表》 CAS 2014年第4期397-401,454,共6页 Control and Instruments in Chemical Industry
基金 中国矿业大学青年科研基金资助项目(OC090196)
关键词 粒子群算法 并行机 批调度 最大完工时间 particle swarm optimization algorithm parallel machines batch scheduling maximum completion time
  • 相关文献

参考文献11

二级参考文献58

共引文献88

同被引文献16

  • 1Finke G,Jost V,Queyranne M, Sebo A. Batch processing with interval graph compatibilities between tasks[ J ]. Discrete Applied Mathematics, 2008,156 : 556-568.
  • 2Mathirajan M, Sivakumar A I. A literature review, classification and simple meta-analysis on scheduling of batch processors in semiconductor [ J ]. International Journal of Advanced Manufacturing Technology, 2006,29 : 990-1001.
  • 3YongjianLi, Jian Chen, Xiaoqiang Cai. Heuristic genetic algorithm for capacitated production planning problems with batch processing and remanufacturing[J]. International Journal of Production Economics. 2007,105 : 301-317.
  • 4Scott Webster, Kenneth R. Baker. Scheduling groups of jobs on a single machine [J]. Operations Research, 1995, 43 (4) 692-703.
  • 5Ravindra Gokhale, Mathiraian M. Minimizing total weightedtardiness on heterogeneous batch processors with incompatible job families [ J ]. International Journal of Advanced Manufacturing Technology, 2014,70 : 1563 1578.
  • 6PaymanJula, Robert C. Leachman. Coordinated multistage scheduling of parallel batch-processing machines under multiresource constraints [J]. Operations Research, 2010, 58 (4) : 933-947.
  • 7Jonah C. Tyan, Timon C. Du, James C. Chen, Ir.-Hui Chang. Multiple response optimization in a fully automated FAB: an integrated tool and vehicle dispatching strategy[J]. Computers g Industrial Engineering, 2004,46 : 121-139.
  • 8Huai Zhang, Zhibin Jiang, Chengtao Guo. Simulation-based optimization of dispatching rules for semiconductor wafer fabrication system scheduling by the response surface methodology EJ . International Journal of Advanced Manufacturing Technology, 2009,41 : 110-121.
  • 9T. C. Edwin Cheng, Zhaohui Liu, Wenci Yu. Scheduling jobs with release dates and deadlines on a batch processing machine [J]. IIE Transactions, 2001,3a (8) 685-690.
  • 10Philippe Laborie, Jerome Pogerie. Reasoning with conditional time-intervals[C]. Proceedings of the 21st International Florida Artificial Intelligence Research Society Conference, Coconut Grove, USA, 2008 : 555-560.

引证文献2

二级引证文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部