针对南水北调中线一期工程漳古段的湿陷性黄土问题,根据实际施工情况采用强夯法和挤密桩法对其进行地基处理,并进行严格的质量控制,取得了很好的实际效果。
According to the problem of collapsible loess in Zhanggu section of middle route first stage for South-to-North Water Dransfer Project, the dynamic compaction method and compaction pile method is adopted to treat the foundation based on practical construction, the better effect is obtained with the strict quality control.
出处
《东北水利水电》
2014年第8期19-21,71,共3页
Water Resources & Hydropower of Northeast China
关键词
漳古段
湿陷性黄土
强夯技术
挤密桩技术
南水北调
collapsible loess
dynamic compaction technology
compaction pile technology
South-to-North Water Diversion project