面向定单的连续生产过程动态调度方法 被引量:3

An Order-Oriented Dynamic Scheduling Method for Continuous Production Processes
在线阅读 下载PDF
导出
摘要 用模糊数描述生产调度问题中定单完成期、处理率、处理时间等因素的不确定性 ,建立连续生产过程中定单变化引起的动态调度问题的模糊优化数学模型。通过求解这个模型 ,能够实现在生产线的生产能力、存储设备的存储能力和定单的完成时间范围等约束条件下的动态调度。仿真结果表明模型的有效性和合理性 ,不仅能满足客户的需求 。 The uncertain factors in the scheduling process such as complete times, processing speed and processing times of order forms are described as a fuzzy. The fuzzy optimal mathematics model of the dynamic production scheduling problems caused by the order forms for continuous production processes are proposed. The dynamic scheduling can be realized by the solution of the optimal problem under constraint conditions such as production capacity of production line,storage capacity of the storage unit and completion time of the order forms. The simulation results show that the model is reasonable and effective. It is not only meet the customer demands, but also obtain the best profit.
出处 《系统工程》 CSCD 北大核心 2002年第4期44-48,共5页 Systems Engineering
基金 国家86 3/ CIMS主题资助项目 (86 3- 5 11- 94 5 - 0 0 2 ) 浙江省科技计划资助项目 (0 12 0 4 7) 教育部高等学校骨干教师资助计划项目
关键词 生产调度 动态调度 连续生产过程 企业 模糊数 Production Scheduling Dynamic Scheduling Continuous Production Process Fuzzy
  • 相关文献

参考文献5

二级参考文献19

  • 1田澎,杨自厚,张嗣瀛.同顺序(Flow-shop)排序问题的模拟退火求解[J].信息与控制,1994,23(3):133-139. 被引量:11
  • 2舒炎泰,赵文钦,朱立禹.流程CIM与离散CIM之比较[J].计算机研究与发展,1996,33(9):661-665. 被引量:16
  • 3金以慧,王诗宓,王桂增.过程控制的发展与展望[J].控制理论与应用,1997,14(2):145-151. 被引量:81
  • 4柴天佑 李平 等.流程工业CIMS的研究现状与对策.第五界中国计算机集成制造系统(CIMS)学术会议[M].成都:-,1998,8.48-54.
  • 5吴悦 汪定伟.单机作业下极大化顾客满意数的前提、拖期调度问题[J].系统工程理论方法应用,已录用,.
  • 6朱学峰 于常友.面向21世纪的过程控制技术.自动化科学技术及应用[M].北京:电子工业出版社,1998.1-6.
  • 7熊刚 许晓鸣 等.流程工业综合自动化的理论研究与实践[J].计算机集成制造系统CIMS,1995,(3):32-35.
  • 8张曾科,模糊数学在自动化技术中的应用,1997年
  • 9Cheng T C E,Eur J Operational Research,1989年,38卷,156页
  • 10Bagchi U,Naval Res Logistics,1986年,33卷,227页

共引文献33

同被引文献29

  • 1赵小强,荣冈.流程工业生产调度问题综述[J].化工自动化及仪表,2004,31(6):8-13. 被引量:29
  • 2霍满臣,唐立新.面向流程工业的批在线调度问题[J].控制工程,2005,12(6):511-514. 被引量:8
  • 3苏生,战德臣,徐晓飞.一种并行机多产品厂短期调度连续时间模型[J].计算机集成制造系统,2006,12(4):494-498. 被引量:7
  • 4Giannelos N F, Georgiadis M C. A novel event-driven formulation for short-term scheduling of multipurpose continuous processes[J]. Industrial and Engineering Chemistry Research, 2002(41): 2431-2439.
  • 5Mendez C A, Cerda J. An efficient MILP continuous-time formulation for short-term scheduling of multiproduct continuous facilities[J]. Computers and Chemical Engineering, 2002(26): 687-695.
  • 6Mockus L, Reklaitis G V. Continuous time representation approach to batch and continuous process scheduling: 1. MINLP formulation[J]. Industrial and Engineering Chemistry Research, 1999(38): 197-203.
  • 7Behzad B, Mahmoud R P, Davood R. Optimal scheduling of mixed batch and continuous processes incorporating utility aspects[J]. Chemical Engineering and Processing, 2007(46): 271-281.
  • 8Storn R, Price K. Differential evolution -- A simple and efficient heuristic for global optimization over continuous spaces[J]. Journal of Global Optimization, 1997, 11(4): 341-359.
  • 9Godfrey O, Donald D. Scheduling flow shops using differential evolution algorithm[J]. European Journal of Operational Research, 2006(171): 674-692.
  • 10Qian B, Wang L, Huang D X, et al. An effective hybrid DE-based algorithm for multi-objective flow shop scheduling with limited buffers[J]. Computers & Operations Research, 2009, 36(1): 209-233.

引证文献3

二级引证文献20

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部