摘要
介绍了电收尘框架结构的爆破拆除 ,对爆破参数、起爆网路和顺序、安全防护措施进行了讨论。
This paper introduces the blasting demolition of electrostatic dust-collection structure during the reconstruction of No.3 kilns in Qinling cement Co. Ltd in Shangnxi Province. The blasting programs of electrostatic dust-collection structure of the No.3,No.1, and No.2 kilns are compared systematically, blasting parameters, priming network and sequence, safety precautions are also discussed.
出处
《爆破》
CSCD
2002年第2期81-83,共3页
Blasting