摘要
结合烟台发电厂 3号机组循环泵改造后的性能试验情况 ,由一系列组合运行方式试验 ,比较不同季节、不同汽轮机负荷和排汽量下 ,循环泵运行组合方式的经济性能 ,探讨循环泵合理经济调度的依据。
With performance tests for the third circulating pump after its reconstruction in Yantai Power Plant and a series of tests for combined operation modes, the economic characteristics for combined operation modes are compared in different loads and exhaust and in different seasons. The basis for reasonable and economic control for circulating pumps is discussed. Key word Circulating water pump Optimizing operation Performance test Economic control
出处
《山东电力技术》
2002年第4期35-38,共4页
Shandong Electric Power