摘要
叙述了铁岭发电厂 1号锅炉电除尘器改造前后的结构情况的对比 ,对改造前的电除尘器的效率及改造后电除尘器的效率情况进行了分析 ,重点介绍了改造后电除尘器的应用情况及存在的问题。
The comparison of structures before and after the reform of electrostatic precipitator of Tieling Power Plant No.1 boiler is illustrated.The efficiencies before and after the reform are analysed.The application and existing problems after the reform are stressed.
出处
《东北电力技术》
2001年第3期5-8,共4页
Northeast Electric Power Technology