摘要
运用数值模拟的手段 ,分析了某水电站大型地下洞室群厂房开挖后围岩的整体稳定性 。
The stability of a chamber group, which is in a big power station, is analyzed with numerical method,and the effect of shearing band to the chamber group stability is discussed.
出处
《太原理工大学学报》
CAS
2002年第4期422-425,共4页
Journal of Taiyuan University of Technology