摘要
通过分析佛山市防洪的水文特征 ,提出了飞来峡水利枢纽建成后 ,因放闸流量的不可预见期 ,将对西。
Felicia water conservancy pivotal project was founded, but its discharge after opening the flood gate is not disciplinarian.So,that affects hydrologic forecasting of the middle and lower reaches of West River and North River.
出处
《佛山科学技术学院学报(自然科学版)》
CAS
2002年第2期61-63,共3页
Journal of Foshan University(Natural Science Edition)
关键词
飞来峡水利枢纽
防洪
水情预报
Felicia water conservancy pivotal project
preventing and controling flood
hydrologic forecasting
influence