摘要
在对广州地铁 1号开通以来运营组织各阶段的基本情况进行简要介绍及分析的基础上 ,结合目前广州地铁面临运营管理要上新台阶、系统设备质保期将陆续结束、2号线开通运营后从单线运营过渡到网络运营的形势 ,对下一阶段运营管理 (包括运营组织、维修组织、系统规程等 )作一些探讨。
Guangzhou Metro Line 1 has been operating safely since its operation from June 28 1997 in the initial phase, and has achieved some social benefits when the whole line was opened to traffic on June 28 1999. Based on the present situation of Guangzhou Metro the author argues that the operational management shall be improved, because the warranty of equipment will expire gradually, and the operation will change from single line to network after the opening of Line 2, the author also tries to make research on the operation management, including operational arrangement, maintenance arrangement, rules and procedures for systems on the next stage.
出处
《城市轨道交通研究》
2002年第2期81-84,共4页
Urban Mass Transit
关键词
广州地铁1号线
地下铁道
运营管理
运营组织
运营规程
维修规程
Guangzhou, metro, operation arrangement, rules and procedures for operation, rules and procedures for maintenance