摘要
西气东输工程管道长达 4 0 0 0km ,横贯我国东部和西部 ,沿线地质灾害类型多样。作好线路岩土工程勘察 ,制定并实施地质灾害防治对策 。
The gas pipeline from west to east in China is over 4000 km.Most of it is located in complicated geological environments with various kind of geological hazards,it is very important to make sure that the construction of the project can be successfully completed and its operation is safe and reliable.Therefore,good engineering survey,and the effective measures must be carefully taken to prevent and control geological hazards on the project.
出处
《天然气与石油》
2002年第1期44-48,共5页
Natural Gas and Oil
关键词
西气东输工程
天然气
管道工程
地质灾害
防治对策
West to East Gas Transportation
Natural gas
Gas pipeline project
Geological hazard
Preventing and controlling measure