摘要 采用力学方法研究了非充分采动阶段随工作面推进覆岩破坏过程与支承压力的动态关系 ,从理论上证明了在一般地层条件下 ,当长壁工作面的开采尺寸达到 1 2 7倍采深时支承压力达到极大值的结论 .这一结论验证了长期以来岩层移动观测的统计结果 (开采尺寸达 1 2~ 1 4倍采深时岩层进入充分采动阶段 ) .研究结果为区段煤柱设计、冲击地压和煤与瓦斯突出的预测等提供了更为准确的理论依据 . This paper studies the dynamic relationship between abutment pressure and overburden collapse process with advancing of working face by mechanical method, and proves the conclusion that the abutment pressure will reach the maximum value when extracting dimension gets about 4/π times mining depth This result confirms the statistical achievement gotten from a large amount of strata movement survey that overburden will reach the fully movement stage when extracting dimension reaches 1 2~1 4 times mining depth, and this conclusion provides accurate theoretical basis for sublevel pillar design and pressure bump, as well as coal and gas burst prediction
出处 《煤炭学报》 EI CAS CSCD 北大核心 2002年第3期273-275,共3页 Journal of China Coal Society
基金 国家自然科学基金项目 (5 0 0 740 2 1) 教育部青年骨干教师项目资助
关键词 长壁工作面 覆岩结构 支承压力 力学方法 冲击地压 瓦斯突出 煤突出 long wall working face overburden structure abutment pressure deep mining
  • 相关文献

参考文献8

  • 1煤炭工业部.建筑物,水体,铁路及主要井巷煤柱留与压煤开采规程[M].北京:煤炭工业出版社,1997..
  • 2煤炭科学研究总院北京开采研究所.煤矿地表移动与覆岩破坏规律及其应用[M].北京:煤炭工业出版社,1981..
  • 3马伟民.采动损害及其防护[M].北京:煤炭工业出版社,1984..
  • 4布克林斯基B A 王金庄(译).矿山岩层与地表移动[M].北京:煤炭工业出版社,1989..
  • 5彭S S 高博彦(译).煤矿地层控制[M].北京:煤炭工业出版社,1984..
  • 6汤建泉.开采覆岩运动和破坏规律的研究[M].徐州:中国矿业大学,1995.51-55.
  • 7姜福兴 王春秋.采动覆岩空间结构及其与应力场的动态关系探讨,地下钻掘采工程不稳定理论控制技术.中国科协第46次“青年科学家论坛”论文集[M].北京:中国科学技术出版社,1999.79-84.
  • 8姜福兴 范炜琳.采场上覆岩层运动与支承压力关系的机械模拟研究[J].矿山压力,1988,(2):69-71.

共引文献2

同被引文献429

引证文献62

二级引证文献659

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部