宝泉抽水蓄能电站装机容量 12 0 0MW ,由上水库、输水发电系统和下水库等建筑物组成。上水库大坝采用沥青混凝土面板堆石坝 ,库盆采用全面防渗方案 ,以减少渗漏损失。设计优化后上水库工程采用的工程布置方案 ,不仅对工程施工和施工导流十分有利 ,而且还有效地解决了超标准洪水和固体径流问题。
The installed capacity at Baoquan Pumped Storage Station is 1 200 MW composed of the head reservoir, system of power generation with water and the tail reservoir. The rock-fill dam with asphalt concrete facing is used in the head reservoir dam, the overall anti-seepage scheme is used in the reservoir basin in order to reduce seepage loss. After the design optimization, the engineering arrangement scheme used in the head reservoir project not only is very beneficial to engineering construction and construction diversion but also solve problems about exceeding standard flood and sediment runoff effectively.
出处
《人民黄河》
CAS
北大核心
2002年第6期24-25,共2页
Yellow River
关键词
宝泉抽水蓄能电站
水库工程
工程设计
防渗
arrangement
seepage
dam and reservoir