摘要
以三峡梯级水电站为例 ,详细完整的介绍了用动态规划法对厂内的负荷进行经济分配的全过程。此方法可以获得水电站厂内最优运行方式 ,指导水电厂的实际运行。
Taking Changjiang Gorges hydroelectric power stations as an instance,using dynamic programming method to carry out economic distribution for interior load,the overall process is detailedly and integrally introduced.With this method,the optimal operation mode of hydroelectric power plants can be obtained,thus the actual operation of hydroelectric power plants are directed.And the algorithm and basis for station interior optimal operation of generetion control are provided.