期刊文献+

永乐电站调压室模型试验 被引量:1

Model Test of Surge Chamber for Yongle Hydropower Station
在线阅读 下载PDF
导出
摘要 结合具体的模型试验,对长引水隧洞引水系统的变态模型设计进行了研究,特别对阻力相似条件进行了分析,指出在变态模型设计中,也可以同时满足沿程阻力相似和局部阻力相似.并给出相应的涌波试验结果.此外,对隧洞至调压室过渡段的流道体型、分流墩形式进行了优化设计,从而改善了流态,减少了水头损失. According to the specific model test ,this paper studies the design of distorted model for long-distance diversion systems.In particular,it analyzes the similarity condition of resistance and p oints out that even in the distorted model design,the simultaneous similarity satisfaction of local resistance and frictional resistance is practical.And the corresponding test results of the surge are provided.In the meantime ,optimum design of flow passage and flow distribution pier in the conjunction of the tun nel and chamber is carried out ,which improves the flow pattern and decreases t he head loss
出处 《水利水电技术》 CSCD 北大核心 2002年第6期63-65,共3页 Water Resources and Hydropower Engineering
关键词 阻力相似 涌波 优化设计 永乐电站 调压室 模型试验 distorted model resistance similarity surge optimum design Yongle Hydropower Station
  • 相关文献

参考文献3

二级参考文献5

  • 1杨建东,徐远杰,张祖莲.采用纵向翼形管模拟水击波速[J].水利学报,1995,27(6):8-15. 被引量:4
  • 2团体著者,水工模型实验,1985年
  • 3左东启,模型实验的理论和方法,1984年
  • 4王树人,东北水利发电学报,1986年,1期,19页
  • 5左东启,模型试验的理论和方法,1984年

共引文献15

同被引文献2

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部