摘要 研究了三台机器调整时间可分离的FlowShop调度问题 ,目标函数为极小化最大完工时间·证明了最优调度可能不是排列调度 ,但是工件在前两台机器上具有相同加工顺序的调度中至少存在最优调度·在排列调度范围内 ,对于工件在第二台机器上的调整时间与加工时间之和的最大值不超过工件在第一台或第三台机器上的调整时间与加工时间之和的最小值的情况 ,给出了求解最优调度分派规则 。 The three machine flow shop scheduling problem with set up time separated was studied. The objective function is to minimize makespan. The optimal schedule was proved to be not permutation schedule. But there is at lest an optimal schedule in the schedules that jobs have same order in first two machines. For permutation schedule, a dispatching rule was given for the case that the maximum of sum of set-up time and processing time on the second machine is no larger than the minimum of sum of set up time and processing time on the first machine or the third machine. Based on the dispatching rule,an optimal polynomial algorithm was presented.
出处 《东北大学学报(自然科学版)》 EI CAS CSCD 北大核心 2002年第3期300-302,共3页 Journal of Northeastern University(Natural Science)
基金 辽宁省科委自然科学基金资助项目 (9910 70 0 1) 辽宁省教育厅高等学校科学研究项目 (2 0 2 62 2 5 0 9112 15 5 8)
关键词 调度 流水作业 调整时间 最优算法 scheduling flow Shop set up time NP hard optimal algorithm
  • 相关文献

参考文献10

  • 1Adiri I,Amit N.Open shop and flow shop scheduling to minimize the sum of completion times[].Computers and Operations Research.1984
  • 2Smith M L,Panwalkar S S,Dudek R A.Flow shop sequencing problem with ordered processing time matrices[].Management Science.1975
  • 3Adiri I,Pohoryles D.Flow shop/no idle or no wait scheduling to minimize the sum of completion times[].Naval Research Logistics.1982
  • 4Parthasathy S,Rajendran C.An experimental evaluation of heuristics for scheduling in a real-life flowshop with sequence dependent setup times of jobs[].International Journal of Production Economics.1997
  • 5Panwalkar S S,Woollam C R.Ordered flow shop problems with no in process waiting : further results[].Journal of the Operational Research Society.1980
  • 6Johnson S M.Optimal two-and-three-stage production schedules[].Naval Research Logistics.1954
  • 7Johnny C Ho,Gupta J N D.Flow shop scheduling with dominant machines[].Computers and Operations Research.1995
  • 8Yoshida T,Hitomi K.Optimal two stage production scheduling with set-up time separated[].American Institute of Industrial Engineers Transactions.1979
  • 9Garey M R,Johnson D S,Sethi R.The complexity of flow shop and job shop scheduling[].Mathematics of Operations Research.1976
  • 10Szwarc W.Optimal two machines orderings in the 3× n flow shop problems[].Operations Research.1977

同被引文献10

  • 1Horowitz E, Sahni S. Exact and approximate algorithms for scheduling non-identical processors [ J ]. J Assoc Comput Mach, 1976,23(2) : 317 - 327.
  • 2McNaughtun R. Scheduling with deadlines and loss functions[J]. Management Sci, 1959,6(1):1 - 12.
  • 3Kawaguchi T, Kyan S.Worst case bound of LRF schedule for the mean weighted flow-time problem [ J ]. SIAM J Comput, 1986,15(4) :1119-1129
  • 4Achugbue J O, Chin F Y. Scheduling the open shop to minimize mean flow time[J]. SIAM J Comput, 1982, 11(3) :709 - 720.
  • 5Gonzales T. Unit execution time shop problems[ J ]. Math Oper Res, 1982,7(1):57-66.
  • 6Adiri I, Arnit N. Open shop and flow shop scheduling to minimize the sum of completion times [ J ]. Computer and Oper Res, 1984,11(3):275-284.
  • 7Lushchakova I N, Kravchenko S A. Two machine shop scheduling with zero and unit processing time[J]. European J Oper Res, 1998,107 (2) :378 - 388.
  • 8Tautenhahn T. On unit time open shop with additional restrictions[J]. Math Oper Res. 1996.43(1):215-231.
  • 9王吉波,唐恒永.Flow Shop排序问题F2|prmu|∑w_j(1-e^(-rC_j))的一个启发式算法[J].系统工程理论方法应用,2001,10(4):311-314. 被引量:2
  • 10赵传立,张庆灵,唐恒永.调整时间可分离的无等待Flow Shop调度问题[J].东北大学学报(自然科学版),2002,23(8):813-815. 被引量:3

引证文献3