摘要
介绍了二滩拱坝混凝土水平施工缝处理及坝基面混凝土浇筑和检查混凝土缝间、混凝土与坝基结合的效果。检查表明 。
The horizontal construction joint treatment of Ertan Arch Dam concrete,concrete placement of dam base and connection efficiency examination between concrete joints and concrete with dam base.The examination shows that the treatment method of Ertan Dam is suecessful.
出处
《水电站设计》
2002年第2期18-20,共3页
Design of Hydroelectric Power Station
关键词
坝基
结合面
拱坝
水平缝
施工缝
二滩水电站
混凝土坝
concrete dam
arch dam
horizontal joint
interface
Ertan Hydroelectric Power Plant