期刊文献+

马尾万吨码头港池增深方案及数学模型试验

Study on Port Basin Dredging for Mawei Dock by Theoretical Analysis and Mathematical Modelling
在线阅读 下载PDF
导出
摘要 马尾万吨码头港池淤积的主要原因是马杭水道出流口的不良河势 ,与闽江上游的来水来沙条件并无直接关系 .提出港池增深工程的指导思想 ,通过局部工程措施 ,使主流靠近码头前沿 ,增强码头前沿的水动力 ,形成有利河势 .经二维数学模型优化比选 ,推荐了实施工程方案 . A large amount of data analysis and calculation shows that the deposition in the port basin of the Mawei Dock is caused by the bad river regime of the Mahang waterway, and is not directly related with water and sediment inflow from the upper Minjiang River. A guideline for port basin dredging is proposed, i.e. local engineering measures should be adopted to force the main water flow toward the dock so as to increase waterpower near the dock, and further to form a good river regime. By comparison and optimization of 2 D numerical models, a construction scheme is recommended.
出处 《河海大学学报(自然科学版)》 CAS CSCD 北大核心 2002年第3期72-76,共5页 Journal of Hohai University(Natural Sciences)
关键词 马尾港 河势 治理工程 数学模型 Mawei Harbor river regime regulation engineering numerical model
  • 相关文献

参考文献1

二级参考文献2

  • 1王船海,河海大学学报,1987年,3期
  • 2程文辉,水利学报,1983年,6期

共引文献16

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部