摘要
本文简单地介绍了嘉量原理的基本理论,及嘉量计算公式,并应用于梯级水电站开发次序优化问题的研究,建立了数学模型,通过实例证明,该方法理论上严谨,计算上简单,适应性和实用性较强,不失为一种有效的方法。
In this paper, the basic theory of jar-metric principle and jar-metric lculation formular are described. They are applied to optimal sequence of cascade hydropower plants and the mathematical models are established. By means of case study, it has been proved this way is well-knit in theory, simple in calculation, highly in adaptable and suitable, and practical methed for optimal sequence of cascade hydropwer plants.
出处
《西北水资源与水工程》
1991年第4期28-33,共6页
Northwest Water Resources & Water Engineering