摘要
根据水电站负荷,运用简化的方法确定优化运行机组台数和机组组合,确定机组间负荷优化分配适宜的调整范围,再以动态规划法确定机组间负荷优化分配,可以大幅度节省计算机时。
In this paper a simple rapid dynamic programming method for solving the problem of optimally distributing the active load of a hydroelectric station among its generating sets is suggested, This method is based both on simplified determination of operating units number and their constitution and on determining the advisable region of load regulation of units. A great deal of computing time may be saved by-using this method. Practical example of calculation is presented
关键词
水电站
水力发电机组
运行
最佳化
hydroelectric station
optimization
operation run
dynamic programming