期刊文献+

基于时间和成本的动态联盟建盟过程分析 被引量:7

Time and cost-based analysis of dynamic collaboration construction
原文传递
导出
摘要 在讨论了 Rick Dove企业敏捷性评价指标和企业经营收益评价方法一致性的基础上 ,基于成本和时间敏捷性评价指标 ,研究了基于生产过程分解和招投标的动态联盟的建盟方法的一般性问题 ,并讨论了影响动态联盟建盟过程整体规划时间和成本的主要因素 ,以及具体的建盟过程步骤。 This paper analyzes the consistency between the evaluation indicator for an enterprise's agility proposed by Rick Dove and the enterprise's income. The general problems of process decomposition and bid based dynamic collaboration construction are then analyzed using a time and cost evaluating indicator of agility. Some factors affecting the time and cost of dynamic collaboration construction are analyzed and the specific steps are given for the dynamic collaboration construction. The evolution of dynamic collaboration and its application to Chinese enterprises are analyzed.
出处 《清华大学学报(自然科学版)》 EI CAS CSCD 北大核心 2002年第3期391-395,共5页 Journal of Tsinghua University(Science and Technology)
基金 清华大学"九八五"校重点资助项目 (0 8110 0 5 0 0 )
关键词 时间 成本 动态联盟 建盟过程分析 敏捷制造 agile manufacturing dynamic collaboration agility
  • 相关文献

参考文献8

二级参考文献23

共引文献219

同被引文献129

引证文献7

二级引证文献51

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部