三峡枢纽围堰发电期泄洪调度水力学研究 被引量:1

On flood-releasing regulation of TGP during cofferdam-retaining generation
在线阅读 下载PDF
导出
摘要 三峡水利枢纽在围堰挡水发电期泄洪运行过程中 ,如何既保证泄洪建筑物及其防冲设施的安全运行 ,又保证对下游流态和堤岸防护影响较小 ,是一个亟待解决的问题。它涉及泄洪调度方案及其他措施等诸多水力学问题。三峡枢纽 1/ 10 0模型泄洪运行水力学试验研究成果表明 :经优化后泄洪的运行方式 ,泄洪可达 6 85 30m3 /s ,坝下防洪设施及下纵围堰安全可得到保障 ;通过底、深孔调度并辅以降低坝前水位等措施 ,可在Q≤ 6 0 0 0 0m3 /s下避免底孔出流打击弧门牛腿现象。 How to secure safe operation of flood releasing works and their scour prevention measures and to less affect downstream flow pattern and dyke protection structures during flood releasing in cofferdam retaining generation period of TGP is an important problem needed to be solved. It deals with series of hydraulics problemsrelating flood releasing regulation and other measures. This paper presents the test results on flood releasing obtained from a hydraulic model with a scale 1∶100. Through the optimazation of schemes the proposed operation mode is the case that 22 deep outlets are opened,i.e.,No.23 deep outlet being closed, and all bottoon outlets opened,its flood releasing discharge may reach up to 68 530 m 3/s,the safety of scour prevention installations and downstream cofferdam may be secured. By optmizing the regulation of bottom and(or) deep outtets and in combination with a certain lowering the water level before Gezhouba Project, the undesirable phynomena of water jet striking the hinged support of tainter gates can be avoided in the cases of Q ≤ 60 000 m 3/s.
出处 《长江科学院院报》 CSCD 北大核心 2002年第2期11-14,37,共5页 Journal of Changjiang River Scientific Research Institute
关键词 挡水发电 泄洪 调度运行 坝下冲刷 三峡工程 围堰 water retaining generation flood releasing regulation operation scour downstrean dam hinge struck by eddies Three Gorges Project(TGP)
  • 相关文献

参考文献2

  • 1车清权 郭红民 等.三峡枢纽泄洪运行1/100整体模型水力学试验研究报告(一)[M].长江科学院,2001..
  • 2程子兵 李利 等.三峡水利枢纽泄洪运行调度1:150整体模型水力学初探试验研究报告[M].长江科学院,2000..

同被引文献1

  • 1车清权 陈辉 刘乃义.三峡水利枢纽泄洪运行1/100整体模型水力学试验研究报告(二)[R].武汉:长江科学院,2004..

引证文献1

二级引证文献6

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部